Any control slower than its workaround produces the workaround.

Approval design is usually treated as a policy exercise. It is mostly a latency problem: the rule that takes three days to clear is the rule people learn to avoid.

Design guide

What an approval workflow is actually for.

Approval has three jobs: making sure the spend is wanted, making sure it is affordable, and leaving evidence that both were checked. Everything else in an approval design is machinery in service of those three.

Workflows fail when the machinery outgrows the purpose — when a €40 order carries the same ceremony as a €40,000 one, or when the approver has no basis on which to decide because the request is a line of free text.

02Design

Five decisions that decide whether the workflow is followed.

An approval workflow is a series of design choices, and each one has a specific failure attached to it. Reading them in order is the fastest way to audit your own.

  1. 01DecisionThe rule

    Decide what needs approving at all

    Not every purchase deserves a signature; a threshold that is too low is a threshold nobody respects.

    The decision to make

    Set the level where the control is worth the delay it creates.

    The failure it prevents

    A queue of trivial approvals that trains approvers to click without reading.

  2. 02DecisionThe rule

    Decide who sees it, deterministically

    Amount, category, site and budget owner should produce exactly one path.

    The decision to make

    Rules written so the same request always routes the same way.

    The failure it prevents

    Requests routed by whoever was asked, which cannot be audited afterwards.

    No rule matches · Requester side

    It falls to a named default

    Never to nobody. A workflow with a hole in it is routed around within a week of being noticed.

  3. 03Approver side

    Decide what the approver sees

    Lines, supplier, contracted price and the reason — enough to make a real decision.

    The decision to make

    Give context in the request, not in a follow-up conversation.

    The failure it prevents

    Approval that is only a signature, because there was nothing to judge.

  4. 04DecisionThe rule

    Decide what happens when nobody acts

    Reminders, delegation and escalation are part of the design, not an afterthought.

    The decision to make

    A path for absence, holidays and departures, defined in advance.

    The failure it prevents

    The workaround: someone orders directly because approval never came back.

    Nobody acts · Approver side

    Decided when the rule is written

    Escalation or automatic approval — chosen in advance, not improvised while a requisition sits still.

  5. 05The rule

    Decide what is kept

    Who decided, when, on what basis, against which price — captured as it happens.

    The decision to make

    Recording as a by-product of the process rather than a separate task.

    The failure it prevents

    An audit answered from a mailbox, six months after the decision.

Design model, not a product screen. Kelqio Approve implements one version of it, and is optional.

03Design

Five rules for an approval process people do not route around.

  1. 01

    Match thresholds to real delegation

    Approval limits should mirror the actual delegation of authority, including differences by site and category. A rule nobody recognises is a rule nobody defends.

  2. 02

    Make the request decidable

    An approver needs structured lines — reference, quantity, contracted price, cost centre — not a description. Most approval delay is really information delay.

  3. 03

    Combine conditions rather than stacking levels

    Amount and category and site, evaluated together, produce fewer hops than a chain of single-condition levels.

  4. 04

    Design for absence

    Delegation and escalation are not edge cases. A process that stalls during holidays trains people to bypass it permanently.

  5. 05

    Record the decision, not just the outcome

    Who approved, when, and against which rule — captured at the time, so the decision can be reconstructed rather than inferred.

04In practice

From a catalog cart to a purchase order.

Because the requisition is built from a catalog cart, the approver sees exactly what the buyer selected, at contracted prices, against a cost centre and a site.

Kelqio Approve
Demo data
  1. Requisitions
  2. REQ-2026-04188
In approval

Q2 maintenance consumables

Requester
C. Moreau
Delivery site
Lyon — Site 03
Cost centre
CC-4402
Budget line
MRO / 2026-Q2
Cart
LinesQty
Nitrile glove, powder-free, L40736,00
Industrial degreaser 5 L121 428,00
Safety goggles, anti-fog25612,50
Absorbent pads, 40×50183 006,00
Total excl. tax5 782,50

Approval

Rule: > €5,000 requires site manager + procurement

  1. M. Lefèvre

    Site manager

    14 Apr, 09:12

  2. A. Brandt

    Procurement

    Pending

  3. ERP

    Purchase order

    Automatic

ApproveReject

On approval, one purchase order per supplier is sent to your ERP.

  • 01

    Requisitions carry structure

    Lines, delivery site, cost centre and budget line are present from the moment the request is raised.

  • 02

    Rules combine conditions

    Amount, category, cost centre, site and supplier can be evaluated together rather than chained.

  • 03

    Multi-site in one requisition

    A single request can serve several delivery sites without manual splitting.

  • 04

    Tracking replaces chasing

    The requester sees order status, so the follow-up email stops being the tracking mechanism.

Approval workflow questions.

How many approval levels should there be?
Fewer than most designs start with. Each level adds latency, and latency is what drives people around the process. Combining conditions in one rule usually beats adding another level.
Should low-value purchases be approved at all?
Often the answer is that they should be controlled rather than approved — through a contracted assortment and a spend limit — so approval attention goes where it changes the outcome.
Do we need this if our ERP already has approvals?
If your ERP covers the spend that matters, no. Kelqio Approve exists for the spend categories that never reached the main system, and it is an optional module.

Next step

Bring your supplier list. We’ll show you the flow.

A working session with our team, using your systems and your supplier mix — not a generic slide deck.

  • 01

    Where your suppliers sit today: connected, semi-connected, or not at all

  • 02

    How each channel would route through Kelqio into your ERP and procurement platform

  • 03

    What connecting the next twenty suppliers would actually involve